# Tesla Aims to Start German 4680 Cell Output by Mid-2027

By John Kim

Canonical URL: https://www.tokenpost.com/news/business/54798
Published: 2026-11-12T02:15:10.000Z
Updated: 2026-11-12T02:15:10.000Z
Section: Business

> The Grünheide line is designed for annual capacity of up to 18 gigawatt-hours, with more than 1,500 cell-manufacturing hires planned.

Tesla is targeting mid-2027 to begin 4680 battery-cell output at Grünheide, where it already makes Model Y vehicles, with cells, packs and finished cars planned at the same site.

The line is designed to reach as much as 18 gigawatt-hours of annual capacity. A gigawatt-hour measures how much energy a battery can store, so the figure describes the potential storage capacity of a year’s cell production. Tesla plans to hire more than 1,500 workers for cell manufacturing.

The project includes dry-electrode coating, which Tesla expects to improve manufacturing efficiency. Production costs in Europe are higher than in Asia, so the project’s economics depend partly on whether those efficiency gains materialize.

Tesla has identified battery availability as a limit on production growth, as covered in our [third-quarter results report](<https://www.tokenpost.com/news/business/38163>). The company also aims to file for permits in December 2026 for a second large production hall, expected to cover about 536,000 square meters.



## Links in this article

- [third-quarter results report](https://www.tokenpost.com/news/business/38163)
