{"id":"tp-25707","type":"article-newspaper","title":"Shipyard to End IPFS Engineering and Infrastructure Operations Sept. 30","author":"Simon Yoon","publisher":"TOKENPOST Inc.","url":"https://www.tokenpost.com/news/technology/25707","datePublished":"2026-09-30T09:13:42.000Z","dateModified":"2026-09-30T09:13:42.000Z","language":"en","abstract":"The shutdown will leave several core IPFS projects without dedicated maintainers as Protocol Labs determines the future of public infrastructure and bootstrap nodes.","section":"Technology","references":[]}