{"id":"tp-29509","type":"article-newspaper","title":"AI Data Center Construction Costs Reach Up to $39.5 Billion per Gigawatt","author":"Simon Yoon","publisher":"TOKENPOST Inc.","url":"https://www.tokenpost.com/news/technology/29509","datePublished":"2026-10-10T11:46:30.000Z","dateModified":"2026-10-10T11:46:30.000Z","language":"en","abstract":"Estimated capital spending ranges from $34.6 billion to $39.5 billion, with Nvidia’s Vera Rubin systems at the high end and OpenAI’s Jalapeno ASIC architecture lower.","section":"Technology","references":[{"title":"prior projections for AI infrastructure spending","url":"https://www.tokenpost.com/news/technology/24280"}]}